Oldman River Phase One Project Phase One of the Oldman River Project consists of two Vestas V80 turbines with an installed capacity of 3.6 MW. The two turbines have been in operation since March 2007. Interconnection of the project is through the Fortis Alberta distribution grid. Capacity factors for the project have been in the high 30% range since the beginning of operation. Phase Two of the project will be located on the same 1600 acre property as Phase One, which is located adjacent the Oldman River Dam near the Town of Pincher Creek, Alberta.
|
|