Oldman 1 Wind Farm

Ownership 100% owned by the Alberta Renewable Power Partnership
Scope Of Work Two turbines totalling 3.6 MW
Schedule Currently Producing

Project Detail

Phase One of the Oldman Project consists of two Vestas V80 turbines with an installed capacity of 3.6 MW. The two turbines have been in operation since March 2007.

Interconnection of the project is through the Fortis Alberta distribution grid. Capacity factors for the project have been in the high 30% range since the beginning of operation.

The project is 100% owned by the Alberta Renewable Power Partnership, and is operated by TransAlta Power Corporation and serviced/maintained by Vestas.