Oldman 2 Wind Farm

Ownership From 2009 to 2013, the Project was co-developed with our joint venture partner, Mainstream Renewable Power. AWEC originated and completed the initial development for Oldman 2. This project was sold to IKEA by means of commissioning in 2014.
Scope Of Work 46 MW Oldman Phase 2 project operates on 1600 (648 Hectares) of private farmland currently under long term lease
Schedule In operation

Project Detail

The 46 MW Oldman Phase 2 project operates on 1600 (648 Hectares) of private farmland currently under long term lease. Construction of the project began in September 2013 and commercial operation began in September 2014.

The project was originated by AWEC in 2005. From 2009 to 2013, the Project was co-developed with our joint venture partner, Mainstream Renewable Power. AWEC subsequently sold it’s interest in the project to Mainstream in 2013. Oldman 2 transferred ownership to the IKEA group upon COD in┬áSeptember 2014.

Project Map